Download

Media & Press

VigiGym Press Kit

Everything you need to write about VigiGym — screenshots in 6 languages, logos, app icon, and key facts. All assets are free for editorial use.

info@vigigym.com

About VigiGym

AppVigiGym — Workout Tracker
CategoryHealth & Fitness · Strength Training
PlatformiOS · iPhone + Apple Watch
PriceFree download · Pro subscription or one-time lifetime purchase
LanguagesEnglish, German, French, Dutch, Spanish, Japanese
DeveloperAchim Loobes — Solo developer, Mönchengladbach, Germany
Website www.vigigym.com

VigiGym is a minimalist strength training tracker for iPhone and Apple Watch. Developed by a solo creator and lifter himself, the app focuses entirely on the workout experience by removing distractions such as social feeds, AI coaching, and gamification.

Instead, VigiGym emphasizes speed, clarity, and precision. Workouts can be logged quickly without a keyboard, routines remain clean and structured, and progress can be tracked through clear visual feedback.

The app integrates deeply with the Apple ecosystem, including Apple Watch support, Live Activities on the iPhone Lock Screen, and real-time heart rate tracking during workouts.

VigiGym is designed for athletes who prefer data and structure over noise and distractions.

VigiGym was created by Achim Loobes, a solo developer and lifelong strength training enthusiast who built the app to solve the limitations he experienced with existing workout trackers.

Key Features

  • Fast workout logging without keyboard input — precision sliders and glove-friendly controls
  • Smart modular system with automatic set pattern recognition (Supersets, Giant Sets, Drop Sets, Pyramid Sets)
  • Structured routines and clear workout history
  • Color-coded progress charts with deep analytics (weight, volume, frequency)
  • Visual muscle mapping — 242 exercises with custom muscle visualizations
  • Apple Watch integration with full standalone workout tracking
  • Live Activities on iPhone Lock Screen and Dynamic Island
  • Real-time heart rate tracking with automatic Apple Health sync
  • Live sync between iPhone and Apple Watch — changes appear instantly on both devices
  • Built-in 1RM calculator with auto-adjusted weights for different training goals
  • Local-first & private — data stays on device by default; optional iCloud Sync available
  • iCloud sync & JSON export for complete training history backup
  • Multilingual support (English, German, French, Dutch, Spanish, Japanese)

Logo & App Icon

Right-click any asset to save, or use the download buttons.

VigiGym Logo — white
VigiGym Logo — black
VigiGym Logo — transparent
VigiGym App Icon

Screenshots Preview

Sample from the English set. Download the full set (iPhone + Apple Watch) per language below.

VigiGym — Training Home
VigiGym — Routines
VigiGym — Live Workout
VigiGym — Progress Charts
VigiGym — Apple Watch
VigiGym — Watch Input

Download Screenshot Packages

Each ZIP contains the VigiGym 4.0 iPhone mockups plus 3 Apple Watch screens in the respective app language. 15 files for EN (incl. Apple Watch exercise live view).

The Developer

Achim Loobes — solo developer and creator of VigiGym

Achim Loobes

Solo developer, strength athlete, and the person behind every pixel of VigiGym. Programming since 1982 — starting with BASIC on a Commodore 64. Decades of training experience informed the decisions that shaped VigiGym. Based in Mönchengladbach, Germany.

↓ Photo

All assets on this page may be used for editorial and journalistic purposes free of charge. Please do not alter logos or create modified versions. Questions? info@vigigym.com